Consulting Services for Supervision Ampelgading Hydroelectric Power Plant (HEPP)
PLTA Ampelgading project Located in Tawangsari Village and Purwoharjo Village, Ampelgading Subdistrict, Malang Urbang Village , East Java Province. In accordance with long-term plan PT. PLN (Persero) Main Of Java Plant and Network, Bali and Nusa Tenggara Ampelgading Hydroelectric Power Plant.
Supervision for Construction of Steam Power Plant (PLTU) 2 NTB – Lombok (2 x 25 MW)
The Lombok 2x25 MW Steam Electric Power Plant, NTB is the First Coal-fired Power Plan in NTB and this is a part of Government Program to replace fuel oil. Jeranjang Steam Electric Power Plant Construction consist of two parts which is worth US$ 30.7 million and in Rupiah reach out Rp 354.3 billion.